FERRUM REQUEST QUOTE

WORKS INDEX — DOC 04

THE PORTFOLIO. STILL STANDING.

EVERY PROJECT BELOW WAS DELIVERED BY FERRUM CREWS. FILTER BY TYPE, OR ASK US FOR THE FULL 483-ENTRY INDEX.

01

FILTERABLE INDEX

09 WORKS

K-214

MERIDIAN MEDICAL PAVILION

SIZE84,000 SF · 4 STOREYS TIMELINE19 MO — 11 DAYS EARLY BUDGET$32–36M · ON BUDGET SERVICESDESIGN-BUILD · GC · CONCRETE

Ground-up outpatient pavilion with imaging suites and surgery center. Delivered under GMP with zero recordable incidents.

COMMERCIALHEALTHCARENEW

K-193

RIDGELINE CUSTOM RESIDENCE

SIZE6,400 SF TIMELINE13 MO BUDGET$2.4–2.8M SERVICESCUSTOM HOME · SITEWORK

Hillside custom home on engineered piers with cantilevered great room. Weekly photo log and ledger to owner, all 56 weeks.

RESIDENTIALNEW

K-221

IRONWORKS FOOD HALL

SIZE31,000 SF · 9 VENDORS TIMELINE12 MO · IN PROGRESS BUDGET$8–10M SERVICESADAPTIVE REUSE · BUILD-OUT

1908 foundry converted to a nine-kitchen food hall. Original crane rails retained as structure — and as the point.

COMMERCIALRENOVATIONINTERIOR

K-207

FOUNDRY ROW LOFTS

SIZE112 UNITS · 5 STOREYS TIMELINE22 MO BUDGET$24–28M SERVICESGC · CONCRETE PODIUM

Podium multi-family over ground-floor retail. Post-tensioned deck poured through a Pittsburgh winter, on schedule.

RESIDENTIALMULTI-FAMILYNEW

K-198

HALLE 9 DISTRIBUTION HUB

SIZE240,000 SF · 36' CLEAR TIMELINE14 MO — 3 WKS EARLY BUDGET$28–31M SERVICESDESIGN-BUILD · SITEWORK

Tilt-up distribution center with 62 dock doors and an FM-rated roof. 11-acre cut/fill balanced on site — zero export.

COMMERCIALINDUSTRIALNEW

K-186

ARSENAL SCHOOLHOUSE REUSE

SIZE58,000 SF TIMELINE17 MO BUDGET$14–16M SERVICESHISTORIC REHAB · GC

1911 masonry school converted to a STEM academy. New steel inside old brick; every original truss saved and load-tested.

COMMERCIALRENOVATIONEDUCATION

K-171

SHADYSIDE GUT RENOVATION

SIZE4,100 SF TIMELINE9 MO BUDGET$0.9–1.1M SERVICESSTRUCTURAL RENO · INTERIOR

Victorian row house taken to the studs; new steel moment frame opened the parlor floor without touching the facade.

RESIDENTIALRENOVATIONINTERIOR

K-204

NORTHGATE RETAIL RE-ROOF

SIZE140,000 SF TPO TIMELINE4 MO · STORE OPEN BUDGET$1.6–1.9M SERVICESROOFING · SELF-PERFORMED

Full tear-off and re-roof over an operating shopping center. Nightly weather-tight lines; zero leak claims, zero closed days.

COMMERCIALROOFING

K-176

VULCAN STREET PARKING DECK

SIZE620 STALLS · 5 LEVELS TIMELINE11 MO BUDGET$12–14M SERVICESCONCRETE · GC

Precast/post-tensioned hybrid deck for the city. Cylinder breaks averaged 118% of design strength across 214 pours.

COMMERCIALCIVILNEW
02

BEFORE / AFTER — DRAG THE LINE

03

PROJECT MAP — WHERE THE WORK STANDS

SERVICE RADIUS — 60 MILES HQ — FOUNDRY ROW K-214 MERIDIAN PAVILION K-207 FOUNDRY ROW LOFTS K-198 HALLE 9 HUB K-193 RIDGELINE RESIDENCE K-186 ARSENAL SCHOOLHOUSE K-171 SHADYSIDE RENO K-204 NORTHGATE RE-ROOF K-176 VULCAN ST DECK K-221 IRONWORKS (IN PROGRESS)
HEADQUARTERS COMPLETED WORK (SELECTED) DASHED — STANDARD SERVICE RADIUS

YOUR PROJECT BELONGS
ON THIS INDEX.